Project Notes
This project involved asphalt shingles, fully adhering rubber into a built-in gutter, and sheet metal. The challenge for this project was the large fascia. We fabricated a very streamlined fascia piece with 2 crimps to ensure that there was no oil canning. We fabricated from 24 gauge pre-finished (Kynar 500 finish) steel.
Services Used:
Asphalt Shingles
Fully Adhered EPDM (lined gutters)
Architectural Sheet Metal